HOME OUR BOARD COVENANTS/BY-LAWS ARC
COMMUNITY/RESOURCES
10th


Architectural Review Committee Members

Contact email: teoa.arc@gmail.com

Tom Remick   
 

Tom Williams

Paul Thomas, Vice-chair

Quentin Hopkins

Don Tyler

Derrick Peake, Architect
    dpeake@pbtcomm.net

         
OctARCHITECTURAL REVIEW COMMITTEE

The ARC will meet next on Oct. 6th

 
To view and/or download the
ARC Guidelines, Operating Procedures or Application Package click on the links below:


ARC Guidelines
(PDF)

ARC Operating Procedures (PDF)

Application Packet
(PDF)

ARC Reports:
  September 2018
  August 2018
  July 2018
  June 2018
  May 2018
  April 2018
  March 2018
  February 2018
  January 2018
  December 2017

ARC-Architectural Review Committee

The purpose of the ARC is to define design standards of construction in Timberlake Estates and to review and either approve or disapprove any and all proposed improvements for a building site within Timberlake Estates including but not limited to: dwellings, garages, outbuildings or any other buildings, construction or installation of sidewalks, driveways, parking lots, mail boxes, decks, patios, courtyards, swimming pools, tennis courts, outdoor athletic equipment, greenhouses, playhouses, awnings, walls, fences, satellite dishes, docks, wharves, rip-rap, bulkheads, boat slips and lifts, exterior lights, any exterior addition to, change, or alteration to existing structures, including without limitation painting or staining of any exterior surface. ARC approval must be obtained for dredging and fill operations, shaping of land areas and drainage, and removal of any trees more than six (6) inches in diameter measured at a height of four (4) feet from the base.